Another section of the dye house. To the left of the electrical boxes is a door opening out onto the top of a steep, three-story flight of stairs down to the boiler room floor. On the left wall of this room is the entrance to the “slab” room .
The “tank” room, in the southeast lower level of the power house wing, is very susceptible to flooding when the river gets extremely high. This may very well be original flooring from 1901.